Land Rover Conformity of Production Facility

Project Description

This project was carried out in as an ECM open book contract between Land Rover, Anglo Holt Construction and ourselves.


The project entailed the design installation and commissioning of full function ventilation plant to serve vehicle test cells, to meet tight constraints laid down by the government for emissions testing of vehicles.


Before the vehicles can be tested, the are left in a heat soak area which is controlled at a set temperature and controlled to +/- 1C.


Allied to the above key areas we were responsible for the design, supply, installation of all the mechanical plant services, and the development of the BEMS system with Andover Controls.


System Description
  • Full Function Close Control of 2 No Vehicle Test Cells
  • Close Temperature Control of Vehicle Heat Soak Area
  • Heating & Ventilation To Workshop Area
  • Comfort Cooling / Heat Pump To Control Room
  • Full Function Close Control To Weigh Room
  • Low Pressure Hot Water Heating Installation
  • Chilled Water Installation
  • Fuel Drain & Re-Fill Facility Including Ventilation
  • Compressed Air Installation
  • Ventilation To Dynomometer Pit